What we did in 2000
Our assignment for 2000 was to complete the kitchen and dining room.
Walls
were knocked down. We paid for local tradesmen to plaster walls and
fit double glazing. |
We
fitted ceilings, levelled floors and laid floor coverings. Hundreds of tiles were put on the kitchen and
toilet walls. |
|
|
Power and lighting circuits were installed. Skirtings, door frames and doors fitted. |
Walls were painted ready for the murals. |