What we did in 2000

 

Our assignment for 2000 was to complete the kitchen and dining room.

 

Walls were knocked down.

 

We paid for local tradesmen to plaster walls and fit double glazing.

We fitted ceilings, levelled floors and laid floor coverings.

 

Hundreds of tiles were put on the kitchen and toilet walls.

 

 

 

Power and lighting circuits were installed.   Skirtings, door frames and doors fitted.

 

Walls were painted ready for the murals.